Construction period and methodのメーカーや取扱い企業、製品情報、参考価格、ランキングをまとめています。
イプロスは、 製造業 BtoB における情報を集めた国内最大級の技術データベースサイトです。

Construction period and method - メーカー・企業と製品の一覧

Construction period and methodの製品一覧

1~1 件を表示 / 全 1 件

表示件数

"Are you only considering redoing and repainting?" A method with overwhelmingly short construction time.

Short construction period! No damage to the floor! No interruption to operations! Available 24/7 throughout Japan.

"I replaced it six months ago. If I had known about this method earlier." This is a voice from our customers that we hear at exhibitions and other events. 【What is the Teratech Method?】 Unlike traditional methods of replacement or resurfacing, this method restores floor slopes, subsidence, and unevenness to a level surface without breaking the floor and without stopping operations. It is a patented method that injects Teratech resin beneath concrete floors (roads) to fill voids under the floor with its expanding force, bringing the sunken floor back to level. Since it uses injection holes smaller than a one-yen coin (6mm) to inject expanding resin without breaking the floor, there is no need to remove goods or machinery. This means there are no additional costs for moving items, temporary storage during construction, or disposal of industrial waste, aside from the construction costs. 【Main Features】 1: Can be constructed without stopping operations 2: Short construction period (150 to 200 square meters in about 8 hours) 3: No need to move goods, racks, or machinery since the floor is not broken 4: Normal use is possible immediately after construction For more details, please view the catalog from the "PDF Download" section. Feel free to contact us by phone (0120-873-835) or email (info@mainmark.co.jp).

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録